Desalination & Power Plant

Challenge: Servicing a large Desalination Plant with capability of processing1 Million Gallons Per Day (MGPD) desalination water and generating over5MW Power including Reverse Osmosis and Water Transmission assets.Valve disks were adversely impacted due to high level of corrosion stemming from the harsh Read More

Skids –Fabricate, Fit & Commission

Challenge: Supply and retrofit skid for an offshore gas plant that required parts required special approval of IECEx due to the functionality and application involving strong chemicals. The project required careful planning and approvals for change management for modifications. The project had Read More

Water &Wastewater Treatment Plant

Challenge: A major global client had concerns due to problems with hard rubber lined pipes used for abrasive fluid in water and wastewater management.Adhesion of lining, bubbling of coating between lining & pipe body continued to pose a challenge in the treatment Read More

Solution for Severe Services Application

Challenge: We worked with a major global client involved in mineral processing. Client was embarking on sourcing alternate supply solution to ensure improved quality, high degree of reliability, cost saving and managing supply chain to deliver on tight lead time; all with Read More

Spent Catalyst Converters & Recovery

Challenge: We worked on an inquiry from a major global EPCM & integrator who has significant market share in recovery & conversions of catalyst converters globally. Having a wide range of catalyst required the right design of external and internal features of Read More

Nitrogen Purging at Offshore Project

Challenge: A Global Client involved in providing integrated solution to the Oil & Gas projects on &offshoreglobally has been sourcing the right solution for Nitrogen Purging. While the valves specifications were indicative from design consultants the challenge was to ensure delivery of Read More

Integrated Valve Management Solution

Challenge: Mining Client at their mineral processing plant had a significant challenge with valves, plug, retainer and lugs. Component failures were imminent due to extreme temperature of around 275° C and bombardment of the plug and inserts by mineral particles at high Read More